EEI complete supply of PicPerf image panels for Graham Construction’s redevelopment of Portrush railway station.
Graham Construction’s Project Manager John Deery;
“Tony and his team from EE Ingleton Engineering delivered a superior product and service from the outset of the Portrush Train Station project. Ingleton’s were engaging, creative, and forthcoming during the tender stage of the project, which set them out from their competitors when the contract was awarded. When the sub-contract was let for the design of the perforated aluminium panels, the team worked diligently with the project management and delivery team to achieve the most aesthetically pleasing interpretation of the images that were selected through public consultation.
The overall level of service and commitment by the team at EE Ingleton to the project was second to none.”

